Catalogue

Getting Started with the STFF-1500 360° Feeding Machine: A Practical Operation Guide

When you are feeding a large pond, carrying feed to the water is only part of the job. You also need to get pellets to the feeding area, spread them around it and keep the daily routine manageable. That is where a pneumatic feeding system can make a practical difference.

The STFF-1500 moves pellets through a delivery pipe and spreads them through 360°, bringing conveying, spreading and timed operation into one system. If you are setting yours up for the first time, this STFF-1500 operation guide will help you understand what each part does, what to check before adding feed and how to make sense of the two controllers.

Start with the installation and safety checks, then try a small amount of feed. There is no need to fill the hopper before you know the system is conveying and spreading correctly.

Still choosing equipment for your pond? Take a look at the STFF-1500 360° air feeding automatic fish feeder to compare its hopper capacity, conveying distance and power requirements with your site. Understanding the installation before you buy can help you make a more informed choice.

From the feed room to the pond: what the system does for you

The feeder uses positive-pressure pneumatic conveying. A high-pressure blower transports pellet feed from the storage bin through a delivery pipe to a floating spreading head. The rotating spreading plate distributes pellets through 360°. The system includes the storage bin, blower, rotary airlock/feed discharge motor, delivery pipe, spreading motor and plate, support frame, rods, floats and electrical control box.

STFF-1500 feeder storage bin, delivery pipe, floating spreading head and support components
STFF-1500 pneumatic conveying and floating spreading system.

Before you start, give the machine room to work safely

The spreading head throws pellets over a wide area, and the system uses three-phase electricity. These precautions belong at the beginning of your routine, before anyone switches the equipment on.

  • The machine uses 380 V, 50 Hz, three-phase AC power. A qualified electrician must carry out electrical connections in accordance with applicable safety regulations and the supplied wiring diagram.
  • Provide leakage, phase-loss, short-circuit and under-voltage protection. Connections must be secure and grounding reliable.
  • Keep personnel more than 30 m away from the spreading plate during operation. Flying feed pellets can cause injury.
  • Do not touch electrical parts or rotating components while the machine is running. Never put hands or tools into the feed inlet to move material: the rotary airlock can cause injury.
  • The blower, motors and blower housing can become extremely hot. Do not touch these parts during operation.
  • Disconnect the power completely before maintenance, repairs or clearing a blockage. Never service energized equipment.
  • Do not operate during thunderstorms; disconnect the power supply.
  • During a power failure, disconnect the supply. The manual warns that the equipment may resume operation when power returns.

Is the STFF-1500 a good match for your pond?

The manual describes this model for ponds and reservoirs larger than 13,320 m². The 500 kg hopper and 50 m delivery pipe are useful starting points when planning where feed will be stored and where the floating head will sit. Check the electrical supply and proposed pipe route as well as the headline feeding capacity.

Item Manual specification
Model / feeding type STFF-1500 / wind send (pneumatic conveying)
Power supply 380 V, 50 Hz, three phase
Spreading motor 1,500 W
Feed discharge motor 120 W
High-pressure blower 3,000 W
Feed storage bin 0.75 m³ / 500 kg
Feeding diameter 60 m
Delivery pipe length 50 m
Delivery pipe Φ50 PE pipe
Feeding ability ≥1,500 kg/h
Pellet size 1-8 mm
Pond area >13,320 m²
Main box dimensions 114 × 112 × 137 cm
Body material Stainless steel

The manual identifies STFF-1500 as an air-conveying, centrifugal-spreading feeder with a flap-type feeding structure; the spreading motor is rated at 1,500 W.

Plan the installation as three connected parts

It helps to picture the installation in three parts: a stable storage bin on land, a balanced spreading head on the water and a sealed pipe connecting them. Working through them in that order makes the setup easier to follow.

1. Start with a stable storage bin

Place the bin horizontally in the feed room or outdoors and secure it with anchor bolts to prevent movement. The blower and feed discharge motor are already mounted on the storage-bin base before delivery.

2. Get the floating head balanced and secure

  1. Bolt the motor bracket to the three support rods.
  2. Connect the support rods to the fixing rods.
  3. Bolt the motor bracket to the spreading motor.
  4. Install the spreading plate and secure it with the key pin and tightening bolts.
  5. Install the floats, move the assembly to its intended pond position and secure it. Add water to the floats as specified in the manual to balance the spreading plate.

Have professionals guide installation. The manual requires the floating feeder/spreading assembly to be positioned more than 30 m from the pond bank and secured using wooden piles or plastic ropes. Do not use iron wire for fixing. Ensure all components are firmly connected.

3. Give the pellets a clear, sealed route to the pond

Connect one end of the Φ50 PE pipe to the elbow at the spreading motor and the other end to the feed inlet hopper connection at the storage bin, following the supplied installation diagram. Seal and tighten joints with sealing adhesive or sealing tape. Keep the pipe unobstructed and all connections airtight.

  • Where the pipe crosses the water surface, use two fixing piles to resist wind and waves.
  • Where it crosses a road, the manual specifies burial about 0.5 m underground to protect it from vehicles.
  • For entry into the feed room, route the pipe through a hole near the bottom of the wall to the hopper connection.

4. Let a qualified electrician handle the power connection

The manual specifies three-phase four-core copper rubber cable and recommends 4 × 1.5 mm² for the spreading motor, discharge motor and blower connections. This is the manual’s recommendation; the qualified electrician must confirm suitability for the actual installation and applicable requirements.

Following the supplied wiring diagram, connect the discharge motor, high-pressure blower and spreading motor, then the 380 V main supply. These are wiring connections, not an instruction to operate exposed electrical equipment. Verify secure wiring, protection and grounding before commissioning.

Your first run: check the system, then add a little feed

A small test gives you a chance to spot an air leak, an unbalanced float or a conveying problem before beginning a full feeding session. With installation complete and the safety area clear, work through these checks.

  1. Check the spreading motor: test normal running and smooth plate rotation, maintaining the required exclusion distance.
  2. Check the feed discharge system: confirm that the 0.12 kW discharge motor drives the rotary airlock blades normally.
  3. Check the blower: confirm normal inlet/outlet airflow and no air leakage at the outlet connection.
  4. Check the timer control box: confirm normal operation.
  5. Check the installation: inspect pipe joints for leakage and confirm that the floating assembly is balanced and properly supported.
  6. Run a small-feed test: only after the preceding checks are normal, add a small amount of suitable pellet feed and test conveying, spreading and spreading distance.

Two controls, two jobs: first set when feeding happens

The controls are easier to understand when you separate their jobs. The automatic timer sets when the machine switches on and off. The feeding controller sets how long the session lasts and how feeding alternates with pauses. Start with the daily schedule, then adjust the feeding cycle.

The multi-period timer determines when the machine switches on and off. Its keyboard locks automatically after 15 seconds without operation. To unlock it, press Cancel/Resume four consecutive times.

STFF-1500 multi-period automatic timer

Set the current day and time

Use Calibrate Week, Calibrate Hour and Calibrate Minute to adjust the day, hour and minute. Week abbreviations are Mo, Tu, We, Th, Fr, Sa and Su (Monday through Sunday).

Set scheduled ON and OFF times

  1. Press Timing to display 1on, the first scheduled switch-on setting.
  2. Use Calibrate Week to select one day, every day or a group of days.
  3. Use Calibrate Hour and Calibrate Minute to set the ON time.
  4. Press Timing again to display 1off.
  5. Select the required day or day group and set the OFF hour and minute.
  6. Repeat for the remaining numbered settings, 2-16, as required. Leave unused timing entries unset, shown as dashes.
  7. Press Clock to finish programming and return to the clock display.
  8. Use Auto/Manual to select OFF, then switch to AUTO, as directed in the manual.

Next, set the feeding rhythm within each session

Once you have chosen the scheduled operating window, turn to the feeding controller. Pay particular attention to the units: the total session is measured in minutes, while the feeding and pause periods are measured in seconds. Keeping that distinction in mind makes the three knobs much less confusing.

The feeding controller adjusts the feeding session and the feed/interval cycle. Its settings use different units:

STFF-1500 controller with total time, feeding time and interval adjustment knobs
Setting Unit Function
Total time Minutes Sets the total feeding-session duration.
Feeding time Seconds Sets the feeding period; the green light is on during feeding.
Interval time Seconds Sets the pause between feeding periods; the green light is off during the interval.

Turn the corresponding knobs to set the required values. The digital display dot flashes once per second while the machine is running. When the display returns to 0, the machine has stopped. On restarting through the power switch or remote power control, the machine follows the previously set procedure.

Power-restoration warning: disconnect the power supply during an outage to prevent unexpected operation when power returns.

If feeding does not look right, start with these checks

If pellets stop arriving or the spreading distance drops, the symptom can help you narrow down where to look. The table below brings together the faults and remedies listed in the manual, so you can describe the issue clearly when arranging service.

Disconnect the power completely before inspecting, clearing or repairing equipment. Electrical checks and motor repairs must be performed by qualified personnel.

Problem Possible causes listed in the manual Action
Floating assembly sinks Broken support rod; leaking float. Replace or repair/weld the support rod as appropriate; replace the leaking float.
No feed is discharged Blocked delivery pipe; hopper discharge failure; spreading motor not running; blower not running. Stop feeding and isolate power. Clear the pipe, repair the discharge mechanism, and have the wiring, motor or blower inspected as appropriate.
Insufficient spreading distance Low voltage at the spreading motor. Have the power supply voltage checked by a qualified electrician.
Blower overheats abnormally Dirty filter element; excessive ambient or inlet-air temperature. Clean the filter element and reduce the inlet-air temperature. Avoid contact with hot components.

Keep pipe connections sealed, the conveying route clear, support connections secure and floats in good condition. Use the small-feed commissioning checks again after relevant repairs before returning to automatic operation.

Make the next feeding session easier to manage

For a large pond, the appeal of the STFF-1500 is practical: store feed in one place, convey it to the floating head and use scheduled operation instead of spreading every batch by hand. Its 360° spreading arrangement and adjustable feeding cycle give you a way to build a more organized feeding routine.

If that fits the way you want to run your site, explore the STFF-1500 360° wind send feeding machine specifications and enquiry options. Before enquiring, note your pond size, available three-phase power, intended hopper position and approximate pipe route. Those details provide a useful starting point for discussing the installation.

Already using the machine and need help? Have the model, affected component and a clear description of the symptom ready when requesting support.

Source: STFF-1500 Air Feeding Automatic Feeder User Manual. This guide reorganizes the supplied manual for online reading; use the wiring diagram and instructions supplied with your equipment for installation.

Previous
Shrimp and Fish Pond Pump Selection Guide: Flow, Head and Pond Size
Next
Optical vs Membrane Dissolved Oxygen Meters: Which Is Better for Aquaculture?
Recent Posts

How to Use a Secchi Disk to Measure Water Transparency

Paddlewheel Aerator Gearbox: Nylon vs Cast Iron for Saltwater Applications

Fordy / FUTI at Qingdao CFSE 2026: Paddlewheel and Impeller Aerators

Optical vs Membrane Dissolved Oxygen Meters: Which Is Better for Aquaculture?

Get Free Quote
Contact Us
Michael

Michael Huang
futi@futi.com
+86 13968610279

mike

Mike Xia
tim@futi.com
+86 13291610116

Get Free Quote